5S Sort

 

 

Sort

" 5S The First Pillar "

5S Audit

5S

5S ppt

 

5S Sort

The first stage is removing the rubbish and clutter, it also involves cleaning and generally making the area tidy. A common area to implement 5S is in machine shops, this will involve removing broken tools and materials that have not been used for some time.

By getting rid of unused items space can be made and items that are used on a regular basis can be found quicker.

A method of removing unused items is to TAG them. Areas are targeted with a "RED Tag" and dated. if the item is then not used within a defined period they are removed and disposed of.

The old saying “When in doubt, throw it out” definitely applies.

When the first pillar is introduced well, improvements in work flow, quality and productivity will be gained.

Problems Avoided

The work area doesn’t become crowed and hard to work in

Lockers, shelves and cabinets for storage do not form walls between employees hampering communications

Time is not wasted looking for tools and parts

Unnecessary inventory and machinery

Unneeded items disrupt the process flow.


When red tagging is completed the factory floor will usually have empty spaces. This empty space can then be used to provide a new layout for the equipment and operations to allow for a better flow.